Facilities
Designed with our customers in mind
Hudapack Metal Treating, Inc. operates two premiere processing plants, both strategically located in the nation’s heartland. Designed with our customers in mind, we’ve invested in the most advanced, reliable equipment, as well as an experienced and knowledgeable team to ensure superior quality and unbeatable results.
ELKHORN, WI
In the summer of 2013 Hudapack completed a $4M expansion at the Elkhorn facility. The addition of this 25,000 sq./ft. increased our foot space as well as our geographical reach across the U.S. The Elkhorn operation runs 24 hours, 7 days a week and is conveniently located off I-43.
65,000 sq./ft. heat treating plant
6,000# capacity AFC Holcroft integral oil quench line
Atmosphere carbonitriding, carburizing, annealing and hardening
100 ton straightening press with up to 60 inch part length
FRANKLIN, WI
The Franklin facility compliments our current atmosphere hardening line at the Elkhorn plant and greatly expands Hudapack’s aluminum and induction capabilities. It operates 24 hours, 5 days a week and is conveniently located off I-94.
41,000 sq./ft. heat treating plant
2,000# capacity AFC Holcroft integral oil quench line
Atmosphere carbonitriding, carburizing, annealing and hardening
straightening with 15 ton press with 48 inch length capacity