Facilities

Designed with our customers in mind

Hudapack Metal Treating, Inc. operates two premiere processing plants, both strategically located in the nation’s heartland. Designed with our customers in mind, we’ve invested in the most advanced, reliable equipment, as well as an experienced and knowledgeable team to ensure superior quality and unbeatable results.

ELKHORN, WI

In the summer of 2013 Hudapack completed a $4M expansion at the Elkhorn facility. The addition of this 25,000 sq./ft. increased our foot space as well as our geographical reach across the U.S. The Elkhorn operation runs 24 hours, 5 days a week and is conveniently located off I-43.

70,000 sq./ft. heat treating plant
300#-6,000# capacity AFC Holcroft integral oil quench line
Atmosphere carbonitriding, carbonizing, annealing and hardening
Induction hardening and annealing
Vacuum processing
Complete metallurgical lab
straightening with 100 ton press with 60 inch length capacity
blasting capability

FRANKLIN, WI

The Franklin facility compliments our current atmosphere hardening line at the Elkhorn plant and greatly expands Hudapack’s aluminum and induction capabilities. It operates 24 hours, 5 days a week and is conveniently located off I-94.

70,000 sq./ft. heat treating plant
300#-6,000# capacity AFC Holcroft integral oil quench line
Atmosphere carbonitriding, carbonizing, annealing and hardening
Induction hardening and annealing
Vacuum processing
Complete metallurgical lab
straightening with 100 ton press with 60 inch length capacity
blasting capability
aluminum and induction capabilities